Selected Project Details
New Science Building – Seattle Pacific University, Seattle, WA
Project Description: Commissioning of 70,000 square foot facility consisting of classrooms,
a greenhouse, teaching laboratories, a lecture hall, and offices. Building designed to meet
LEED “Silver” requirements.
WCG Scope: Review of specification sections, commissioning of mechanical systems including
fume hoods and cabinets, laboratory equipment, controlled environment rooms, plumbing, deionized water system, fuel oil system, lab compressed air system, lab vacuum system, hot
water heating system, greenhouse hydronic piping, air, and environmental control systems,
chilled water system, air handling equipment, laboratory airflow control system and DDC Control
System. CA was responsible for ensuring compliance with LEED-related commissioning
requirements. Also responsible for coordination of owner’s employees in equipment start-up.
WCG Project Manager: Steve Bradley
Project Contact Person: Wayne Elling, Associate Director for Project Management,
Seattle Pacific University (206-281-2599)
Health Sciences Building - University of Utah, Salt Lake City, UT
Project Description: New construction of a 5-story, 159,000 square foot,
classroom building including wet lab space. There is a four story atrium
in the entry to the building and one level of parking underneath. The
design includes a high level of information technology. Project achieved
LEED Certification.
WCG Scope: Commissioning Authority services including oversight of
contractor start-up/testing, installation verification, functional
testing, trend log review, TAB review, project closeout and post
occupancy review. Mechanical Systems Commissioned: high temperature
system, heating/chilled water system, large rooftop air handlers, VAV
terminal units, building control system and domestic water heating.
Electrical Systems Commissioned: power distribution, lighting controls,
generator systems and life safety (fire alarm and smoke evacuation
systems). Other Systems: Elevator
Construction Costs: $40M
WCG PM: Bryan Welsh
Project Reference: Lyle Knudson, Project Manager, Division of Facilities
& Construction Mgmt, State of Utah, (801-538-3275)
University of Puget Sound Wyatt Hall, Tacoma, WA
Project Description: New construction, 46,400 square foot, three level academic building.
WCG Scope: Full mechanical commissioning on large air handler, hydronic heating system,
boilers, fin tube heaters, zone heating coils, exhaust fans, smoke evacuation and Johnson
Controls system. Electrical systems including power distribution, communications and fire
alarm. Fire sprinkler system.
WCG Project Manager: Bryan Welsh
Project Contact Person: Steve Nichols, Heery (253-756-8415)
Jones Hall - University of Puget Sound, Tacoma, WA
Project Description: Complete renovation of four-story academic and administration
building including complete replacement of mechanical system.
WCG Scope: Mechanical and HVAC commissioning on large rooftop air handlers, duct heating
coils, fin tube radiators, steam convector, hydronic system and Johnson Control System.
WCG Project Manager: Bryan Welsh
Project Contact Person: Paul Robertson, Facilities Manager (253-756-8296).
Collins Library - University of Puget Sound, Tacoma, WA
Project Description: Major remodel including modifications to mechanical system,
38,500 square foot, four level library building.
WCG Scope: Full mechanical commissioning on large air handlers, hydronic heating system,
steam hot water converter, small chiller, chilled water system, cooling tower, fan coils,
zone heating coils, exhaust fans and pneumatic controls.
WCG Project Manager: Bryan Welsh
Project Contact Person: Bart Heath, Seneca Group (206-628-3150).
McIntyre Hall - University of Puget Sound, Tacoma, WA
Project Description: Complete remodel including all new mechanical and electrical systems,
38,500 square foot, four level academic building.
WCG Scope: Full mechanical commissioning on large air handlers, hydronic heating system,
steam hot water converter, small chiller, chilled water system, cooling tower, fan coils,
zone heating coils, exhaust fans and Johnson Controls system. Also fire alarm and suppression
systems.
WCG Project Manager: Bryan Welsh
Project Contact Person: Steve Nichols, Heery (253-756-8415).
Student Center Building - South Puget Sound Community College, Olympia, WA
Project Description: New construction, 29,000 square foot student center facility.
WCG Scope: Whole building commissioning on hydronic heat pumps, cooling tower, boiler,
TAB, plumbing, fire sprinkler systems, lighting controls, fire alarm system, masonry, roofs
and hardware.
WCG Project Manager: Bryan Welsh
Project Contact Person: Nancy Johns, Project Manager, State of WA (360-867-6041).