Commercial/Office Facilities List
WCG has commissioning experience on nearly 400 separate facilities for more than 175 different clients. The following sampling has been provided as a demonstration of our commissioning capability in a wide variety of facility types. Listed projects may be either in progress or complete.
Client List
- Children's Hospital
- Cobb Building
- Hewlett Packard
- PacifiCorp
- Salt Palace Convention Center
- Washington State Department of General Administration
Selected Project Details
Cobb Building - Seattle, WA
Project Description: This is a century old 11 story building occupying
75,300 square feet, and is on the historical register. The façade of the
building is of historical significance allowing minimal or no penetrations
for new services. It will have upscale residential rental units on floors 2
through 11 and retail spaces on the first floor and basement. The building
was completely gutted except for the bank on the first floor. Project goal
is LEED Silver certification. (2 phase project)
WCG Scope: Commissioning of all new mechanical and electrical systems for
the new residential units and retail space. This included a hydronic pump
loop system with heat pumps in each residential unit for cooling and
heating. The HVAC system for the bank was kept operational during the
project. Other commissioned systems include upgraded fire water service,
individual metering for each unit for electrical and utilities, heating and
cooling recovery from nearby buildings, and Johnson Controls control system.
WCG PM: Tim O’Neill
Project Reference: Carrie Holmes, Unico Properties (206-628-5087)
Salt Palace Convention Center, Salt Lake City, UT
Project Description: A 145,000 square foot exhibit hall
and another 72,500 square feet of meeting space. The Salt Palace Convention
Center will have accumulated 515,000 square feet of exhibition hall and 164,000
square feet of meeting rooms and ballroom space with completion of this latest
expansion.
Also includes a two-level underground parking garage. The project goal is LEED
Certification.
WCG Scope: HVAC systems and controls, Irrigation, plumbing fixtures and
plumbing infrastructure, Lighting (interior and exterior) and energy-generating
equipment and controls, Building envelope materials and integrity, and
Daylighting systems.
WCG PM: Jeff Small
Project Reference: Ken Ament, Construction Controls Corp. (801-578-1201)
Sand Point Way Facility - Children's Hospital, Seattle, WA
Project Description: Commissioning of 100,000 square foot facility including administrative
offices and data center.
WCG Scope: Full commissioning of mechanical systems including controlled environment rooms,
heating/chilled water system, lighting controls, hydronic piping, air, and environmental control
systems, air handling equipment, and generator systems and DDC Control System. Also responsible
for coordination of equipment start-up.
WCG PM: Steve Bradley, Bryan Welsh
Project Reference: Bob Sarff, Facilities Manager, Children's Hospital and Regional
Medical Center (206-987-2160)
Large Office/Manufacturing Facility – Pacificorp ,Corvallis, OR
Project Description: Retro-commissioning of existing HVAC system to determine energy
conservation measures on large, 160,000 square foot office and manufacturing facility on the
Corvallis campus of a high-tech manufacturing firm.
WCG Scope: HVAC commissioning on large air handlers, VAVs with hydronic reheat, chilled
water system, heating water system, Liebert air conditioning units and a hybrid DDC,
electronic, and pneumatic control system. Detailed energy conservation measure report
was issued to client at project close-out. Eighty issues were identified; 17 issues determined
to have a “high energy impact” were used to calculate savings. Eight energy conservation
measures were recommended; resulting savings totaled 1,069,524 kWh (8-month payback of
commissioning costs).
WCG PM: Bryan Welsh
Project Reference: Don Jones, Pacificorp Manager (503-813-5184)
Federal Reserve Bank - Pacificorp, Portland, OR
Project Description: Retro-commissioning of existing HVAC system to determine energy
conservation measures on 90,000 square foot, six story office building. The retro-commissioning
of the bank’s building systems was focused on equipment operations and energy efficiency.
WCG Scope: Retro-commissioning of the HVAC system included testing of the building’s 6
main air-handlers and return fans for economizer operation, heating and cooling modes, and
general conditions and scheduling. Floor level terminal units were tested for heating valve
leakage and proper operation was evaluated. The building’s chilled water and heating water
systems were tested for proper operation, scheduling and set points. Individual air
conditioning units were evaluated for proper operation and general conditions. Systems
testing produced six low cost energy savings issues and recommendations. Estimated energy
savings from these six issues totaled 35,098 kWh / 3,865 Therms annually.
WCG PM: Bryan Welsh
Project Reference: Don Jones, Pacificorp Manager (503-813-5184)
Merrill Creek Administration Building, Everett, WA
Project Description: Retro-commissioning, 20,000 square foot office building.
WCG Scope: HVAC and controls retro-commissioning for central packaged rooftop air
handler with economizer, direct expansion cooling, series VAV boxes with electric heating
coils, Alerton DDC controls.
WCG PM: Jeff Small
Project Reference: Scott Mohr, Project Manager, Coffman Engineers (206-521-0750)